CLIENT: | Schuff Steel Company |
LOCATION: | Arizona, USA |
COMPLETION DATE: | 2019 |
The Banner Desert Medical Centre expanded their facility to include a new 2,900 ton children’s hospital. The seven storey main building towers above several lower building structures.
There are many curved beams and angled concrete floors giving this building a sculptured look. A total of 10,480 drawings were issued for fabrication. To assist with the co-ordination of other trades, 3D steel models were provided to the general contractor on a weekly basis.
It is our unique combination of experience, expertise and technology that turns complex data into intelligent and context rich models.
© 2012-2024 M-BIM Vircon | Web design by Kevin Media | Privacy Policy
© 2012-2024 M-BIM Vircon | Web design by Kevin Media
Privacy Policy